Unlocking Flexibility
Without Curtailment
How Piq's agentic grid planning platform helped Base Power prove the value of its distributed battery fleet in ERCOT
Executive Summary
Data centers are driving the fastest growth in U.S. electricity demand in decades, but long grid interconnection timelines mean these loads are struggling to access firm power connections. Base Power, a home battery manufacturer, developer, and operator based in Texas, believes its fleet of over 1 GW of battery energy storage can unlock such firm connections.
Base Power’s residential batteries represent the fastest deployment of energy storage on the grid. Yet while these batteries could be rapidly installed to address potential grid constraints and accelerate grid interconnections without requiring curtailment, a lack of analysis and clear market rules is limiting their impact today.
To help shape ERCOT’s final rules for the ADER (aggregated distributed energy resources) Pilot Project Phase IV, Base Power needed a bespoke analysis that could map its distribution-level fleet of over 20,000 battery sites and analyze their ability to resolve real constraints across ERCOT’s transmission grid.
This type of study had rarely been done before and never within the time frame to meet ERCOT implementation timeline.
Designed decades ago, traditional grid planning systems are ill-equipped to handle the complexity of novel grid technologies like aggregate DERs. Using traditional grid planning tools and methodologies, this analysis would take months of labor from specialized power system engineering consultants. Using Piq Energy’s agentic grid planning platform, Base Power got results in just a few days. In a recently published white paper, Base Power and Piq Energy showed that at one Fort Worth-area substation, just 81.5 MW of battery dispatch could resolve all 8 constraints introduced by a new 100 MW load.
The result is a template not just for Base Power and ADER, but for any grid solution that needs fast, rigorous analysis to unlock power and accelerate interconnection.

Unlock
the grid.